An electro-optical/infrared (EO/IR) gimbal may look compact in a product photograph, but its impact on an unmanned aerial vehicle (UAV) extends far beyond the camera housing. A dual-sensor payload adds imaging electronics, stabilized mechanisms, cables, mounting hardware and continuous electrical demand to an aircraft with a finite mass and energy budget. Comparing EO/IR payload power consumption and weight requires complete installed systems under the same mission conditions, not isolated headline weights.
For original equipment manufacturers (OEMs), system integrators and technical buyers, the practical question is: What sensing performance is gained for each additional gram, watt and integration requirement? This guide explains how to document size, weight and power (SWaP), distinguish typical from peak consumption, build defensible estimates and verify the result on the actual aircraft. It does not assume that a heavier or more power-hungry EO/IR configuration produces better mission data.

Why EO/IR Payload SWaP Is More Than a Catalog Number
A dual-sensor camera is a collection of subsystems
A typical EO/IR design combines a visible-light electro-optical (EO) channel, an infrared (IR) imaging channel, a stabilized gimbal, a controller and one or more communication interfaces. Depending on the design, motor drivers, image encoders, storage, AI processing and thermal management may share power electronics or operate as separate loads. A rangefinder or other optional module changes the configuration again. Buyers should request the exact bill of integrated functions, not rely on a generic family name.
A camera with fewer features may offer a useful weight and power advantage if the mission only requires daytime visual inspection. Teams evaluating a simplified architecture can compare visible-light camera payloads with dual-channel options, while checking whether losing thermal information would change the inspection outcome.
Use one definition of installed mass
A quoted camera mass may omit the installation kit. The OEM should separate bare payload mass from flight-ready installed mass. The latter includes anti-vibration mounts, structural adapters, quick-release hardware, connectors, cable harness, strain relief and all mission-specific accessories. For aircraft stability, the position of this mass matters as much as its total.
Consider the center of gravity (CG), not only the gross payload allowance. Shifting a gimbal forward or below the airframe can change trim, control margin, landing clearance and structural loading. The FAA’s Weight & Balance Handbook provides general CG calculation methods [3]; UAV limits must be established by the specific aircraft’s engineering team, not inferred from piloted-aircraft examples.
Remember dimensions, inertia and service access
Two installations with the same mass can create different engineering problems. A larger enclosure may raise drag, obstruct a sensor or change the camera’s pointing envelope. A mount with excessive compliance may introduce resonance. The requested documentation should include outer dimensions, mounting datum, mass-property assumptions, service access and the clearance envelope for full gimbal motion.

Map the Electrical Loads Across All Operating States
Typical, transient and peak power answer different questions
A single “power consumption” number rarely describes the full operating envelope. Typical electrical power helps estimate energy use during a representative mission; peak demand helps size the power distribution network, wiring, connectors, protection and transient response. Startup inrush, gimbal acceleration, zoom motor movement, image-processing load and optional accessories may occur simultaneously in ways that a nominal rating does not capture.
Request a measured table specifying supply voltage, current, temperature, firmware, channel configuration and workload. A standard EO/IR viewing mode, active EO zoom, IR image processing, recording and optional AI workload may have different profiles. No universal wattage should be assumed across HITS models or across thermal detector technologies.
How to calculate power from voltage and current
For a direct-current input, P = V × I gives electrical input power in watts (W) from voltage (V) and current (A), when evaluated at the same instant. For example, an illustrative 24 V bus supplying 1.2 A corresponds to 28.8 W. A transient 1.8 A at the same assumed voltage corresponds to 43.2 W. These are calculation examples only, not published specifications for any HITS camera.
Energy requires a time profile, not a peak multiplied by flight time
Average energy consumption is accumulated over time: E = ∫P(t) dt. In a simplified constant-load case, E (Wh) = P (W) × time (h). A 30 W payload running for 20 minutes consumes approximately 10 Wh under that assumption. In practice, a power log should capture changing bus voltage, gimbal motion, sensor modes and peak duty cycle before a flight battery is sized.
Thermal channels do not all have the same power architecture
An uncooled long-wave infrared (LWIR) sensor and a cooled infrared system can have different startup sequences and thermal-management requirements. Even among uncooled designs, processing, temperature stabilization, shutters or non-uniformity correction procedures depend on the camera. Do not apply a cooler power figure to an uncooled camera, or claim that every LWIR payload needs a cooler. Verify whether heaters, fans or other conditioning functions are present in the chosen model.
Teams comparing infrared options should review thermal imaging payload options alongside the actual detector configuration and its supported operating-temperature range. A thermal camera’s measurement capability should also be checked separately from its imaging capability.
Power integrity can be as important as nominal wattage
A gimbal can reboot or drop frames even when average energy consumption seems acceptable. Undersized harnesses, connector resistance, shared supply transients, poor grounding or insufficient power-supply headroom may cause voltage sag. The aircraft power-distribution design must be reviewed for minimum input voltage, voltage ripple, startup current, electromagnetic compatibility and fault isolation.
ArduPilot describes calibrated battery voltage/current measurement and different monitor technologies [1,6]. Those measurements help establish aircraft-side power behavior; they do not replace direct measurement at the payload connector, especially when different voltage rails or DC–DC converters are involved.

Compare Installed Weight Without Losing Mission Capability
Mass saved is useful only when the required images remain usable
A lighter configuration can free airframe capacity, improve integration flexibility or reduce structural demands. But choosing mass alone may compromise the working distance, visible detail, thermal coverage or stabilization needed by the application. A buyer should define the smallest object or condition to inspect, the expected viewing distance, the illumination and thermal contrast, and the video requirements before setting a payload mass target.
For example, an infrastructure-inspection aircraft may need EO detail for a visual defect and thermal context for abnormal heating. Another daytime documentation mission may not need the IR channel. The appropriate comparison is therefore mission-specific, not “dual-sensor is always best”. HITS industrial UAV inspection applications provide context for how imaging objectives affect the required payload category.
Options such as AI and quick-release mounts belong in the mass budget
Optional onboard analytics can affect electronics, heat and power. A quick-release mechanism may improve field servicing but changes the installed mass and interface stack. Not every module is available on every product or carried in the listed base weight. Request separate values for the exact ordered configuration and identify which accessories are required for flight readiness.
A worked installation budget — illustrative only
Suppose an OEM has a 1.25 kg camera-installation allowance. An assumed gimbal of 0.84 kg, vibration hardware of 0.12 kg, quick-release plate of 0.11 kg and cable/connector assembly of 0.07 kg produce 1.14 kg installed mass, leaving 0.11 kg nominal margin. These are hypothetical numbers to demonstrate accounting; the aircraft team must still approve CG, attachment loads, structural strength and mass growth. The margin is not a flight-readiness certificate.
If one supplier quotes only a bare 0.84 kg camera while another quotes a full installed assembly, the two numbers are not directly comparable. Ask each supplier to fill in a common mass-breakdown form and specify whether protective covers, recording media, thermal management or optional modules are included.

Translate SWaP into an Aircraft Energy Budget
Separate sensor electrical demand from the mass effect on propulsion
An EO/IR payload affects endurance through at least two pathways: direct electrical demand and changes in the aircraft’s propulsion requirement due to installed mass, drag and balance. The second effect varies with rotor arrangement, aircraft speed, transition phases and control margin. There is no trustworthy universal rule that an extra 10% payload mass cuts endurance by 10%.
A general payload-and-endurance analysis appears elsewhere in HITS’ Gimbal Cameras theme. This article isolates the EO/IR-specific differences between sensor configurations, including electronics, image-processing states and accessory loads; it does not claim to predict a particular aircraft’s total flight time from camera mass alone.
Illustrative A/B electrical budget with a fixed airframe load
Consider an intentionally simplified example with 270 Wh of usable mission energy after a separately defined reserve policy and a held-constant non-payload demand of 430 W. Configuration A draws an assumed average 18 W and Configuration B draws an assumed average 31 W. Both numbers are hypothetical and deliberately exclude installation-mass and aerodynamic differences.
| Assumption / calculation | Option A | Option B |
|---|---|---|
| Average EO/IR electrical draw | 18 W | 31 W |
| Other aircraft demand (held constant) | 430 W | 430 W |
| Simplified total average demand | 448 W | 461 W |
| Usable energy after reserve | 270 Wh | 270 Wh |
| Estimated time: 270 Wh / power | 36.2 min | 35.1 min |
| Illustrated difference | — | ~1.0 min less |
This isolates electrical power difference only, using t = E / P. The calculation does not incorporate changing hover power, thermal conditions, battery age, voltage sag, drag, extra installed mass or flight phases. It must not be interpreted as a HITS payload flight-test result or as a guaranteed endurance penalty. A validated aircraft model and matched flight logs are required for mission planning.
Keep the reserve policy explicit
A battery’s nameplate watt-hours should not automatically be treated as fully usable mission energy. The OEM defines operational reserves, allowable depth of discharge, temperature assumptions and contingency margins in accordance with the airframe’s approved limits. PX4 battery status includes voltage, current, discharge and remaining-capacity fields [2], while ArduPilot battery monitors can inform battery-failsafe behavior [6]. These logs support review, but the crew must also establish sensor accuracy and synchronization.
How to run a controlled endurance comparison
Use the same airframe, battery type and condition, route or hover profile, ambient conditions and reserve thresholds. Document differences in installed mass, CG and payload configuration. If possible, measure input power on the payload rail and total aircraft power concurrently. Repeat runs; compare distributions and failure events rather than selecting one attractive example. Aircraft teams should decide safe operating limits and test acceptance criteria before flight.

A Repeatable Power and Weight Acceptance Test for OEMs
Stage 1: documentation and configuration freeze
Collect the exact model ID, options list, assembly drawing, base and installed weight, mounting geometry, supply-voltage range, peak/current profile, environmental operating limits and interface-control document (ICD). Record the firmware version, thermal sensor type, video output and any AI or recording module. The procurement team should request these documents for the quoted configuration, not simply a series brochure.
Stage 2: bench-test the payload rail
With the camera secured under the supplier’s safe handling instructions, measure current and voltage at the payload input during startup, idle, EO-only activity, EO+IR operation, zoom, gimbal motion, recording and any supported optional function. Record time series and peaks; measure thermal behavior if required. Ensure calibrated instrumentation, safe current limits and adequate electrical protection. Compare the results to the supplier’s declared limits and report deviations.
Stage 3: validate the control and video path
Electrical performance alone does not prove integration. Test camera and gimbal command/feedback paths, loss-of-link response, mode changes, streaming reliability and recording continuity. MAVLink Gimbal Protocol v2 defines distinct manager and device roles [4], while its Camera Protocol v2 describes camera capabilities and stream-information mechanisms [5]. Implementation still varies by model and firmware; the protocol name alone is not evidence of full compatibility. The gimbal camera integration guidance explains these interface considerations in more detail.
Stage 4: aircraft installation and vibration review
Weigh the complete installation and check CG against airframe-specific limits. Confirm connector retention, cable flexing, mounting-bolt engagement, thermal clearance and the gimbal’s complete movement envelope. During controlled vibration checks, look for loss of image stability, resets and unexpected power spikes. Record conditions and unresolved issues rather than treating a single clean video clip as proof.
Stage 5: phased flight validation and change control
Use the aircraft team’s authorized test procedure to measure representative mission power and image performance. Record weather, airframe mass, battery state, phases of flight, gimbal operating modes, and command/video failures. Document the acceptance status of each requirement: pass, fail or untested. Re-test after any change in camera firmware, harness, mount, thermal hardware or power converter that could affect the result.
| Engineering question | Evidence to request | Acceptance ownership |
|---|---|---|
| What is installed payload weight? | Scale record + BOM and mount drawing | Airframe mechanical lead |
| Can the bus withstand startup/peak? | Voltage/current trace at input | Electrical integration lead |
| What is typical mission load? | Time-stamped mode/power log | Power systems lead |
| Does extra mass affect handling? | CG calculation + approved aircraft checks | Flight-test lead |
| Will EO/IR and video operate reliably? | Mode transitions, stream log, fault record | Software/payload lead |
| Can the OEM maintain the configuration? | Firmware version + revision history | Quality/production lead |

HITS EO/IR Examples for a Power and Weight Review
HQ-64DA, HQ-95Q and HQ-115T illustrate different mechanical and sensor configurations. The values below are entries on the linked HITS product pages, checked on 13 November 2026. They are catalogue head figures, not measured installed assemblies or a controlled A/B endurance comparison.

HQ-64DA
Two-axis · EO + IR
Catalogue head mass: ≤260 g
Published power entry: 10 W / 20 W

HQ-95Q
Three-axis · visible EO + IR + LRF
Catalogue head mass: ≤400 g
Published power entry: 15 W / 30 W

HQ-115T
Three-axis · EO + IR + LRF · 30x EO zoom
Catalogue head mass: ≤1 kg
Published power entry: 15 W / 50 W
The product pages list two power values without defining the operating conditions in that table. Do not automatically label the pair as typical and peak, or use the lower value as a mission average. Request the exact firmware, supply voltage, mode, optional modules and measured startup/peak traces. Include the mount, harness and other required hardware in installed mass. An LRF measures distance; it is not an additional video camera.
How UAV Buyers Should Compare Supplier Quotations
Normalize specifications before negotiating a price
A low quote can omit the very items needed to integrate a camera. Ask suppliers to state whether the offer includes vibration isolation, aircraft mounting adapter, harness, firmware features, interface documentation, environmental checks and technical support. The same comparison should cover delivery configuration, sample availability, warranty and quality traceability. A procurement table is only meaningful when every row describes the same scope.
Questions to send with an EO/IR RFQ
- What is the bare payload mass, and what is the installed flight-ready mass including accessories?
- At which input voltage, ambient temperature and sensor workload are typical and peak power specified?
- Are image processing, recording, AI features and optional measuring modules included in the stated values?
- Can the supplier provide verified mechanical drawings, electrical limits, connector pinout and ICD for the exact model revision?
- Which model-specific functions are supported over the control interface, and how is video delivered to the ground station?
- What are the sample-test procedure, quality records, warranty terms, lead time and engineering-support scope?
For an initial OEM discussion, HITS can review a mission profile, UAV type, installation-mass budget, available supply voltage, EO/IR requirements and target quantity. Product suitability should be determined from the full HITS payload portfolio rather than assigning a default model to every project. Teams can browse the EO/IR gimbal configurations and request an EO/IR integration review with these requirements.
Frequently Asked Questions
Does an EO/IR gimbal draw its rated power at all times?
Not necessarily. Current draw may vary by operating mode, motion, recording or enabled modules. The OEM should request measured normal and peak load profiles with clearly identified conditions rather than assuming that a nominal value describes all states.
Is a lighter EO/IR camera always better for endurance?
No. A lighter camera may reduce installation mass, but flight-time impact depends on the aircraft’s propulsion system, drag, power conversion and mission. It must also meet the required imaging distance and quality.
Can battery current logs replace a payload power measurement?
No. Battery logs represent aircraft-side measurements and may include multiple consumers, converters or monitoring errors. A calibrated sensor at the payload input is preferable for isolating the camera’s own electrical draw.
Should an OEM use one standard weight figure across HQ, XQ and SQ models?
No. Size, weight, power, options and interfaces must be compared by the exact product model and revision. A series label alone does not establish installed weight, peak load or aircraft compatibility.
What information is most useful for an early supplier review?
The UAV model, intended inspection target, payload mass and CG allowance, supply-voltage limits, operating profile, preferred EO and thermal capabilities, control/video interfaces and order stage allow a supplier to shortlist viable configurations efficiently.
Conclusion: Buy the Mission Outcome, Validate the Full Installation
EO/IR payload selection is an engineering trade-off, not a contest of the highest specification. Installed mass, real electrical load, airframe integration, and usable imagery should be evaluated together. An OEM that measures each component and records the operating conditions can compare suppliers more fairly, avoid unexpected power-distribution issues and make decisions that remain useful after installation.
The next practical step is to request model-specific drawings and a typical/peak power profile, then verify those numbers against the proposed aircraft and mission. HITS supplies stabilized EO, thermal and EO/IR payload options for industrial UAV integration; every recommendation should be confirmed for the selected configuration before purchase.
Review Your EO/IR Installation Budget
Send your installed-mass allowance, supply-voltage range, required imaging modes, aircraft interface and mission profile. Request a configuration-specific mass breakdown and typical/peak power test conditions.
References and Technical Sources
[1] ArduPilot — Power Monitor/Module Configuration (voltage and current measurement and calibration)
[2] PX4 — BatteryStatus message definition (voltage, current, discharge and remaining charge fields)
[3] FAA — Weight & Balance Handbook and aviation reference publications (general CG methodology)
[4] MAVLink — Gimbal Protocol v2 (roles, status and control architecture)
[5] MAVLink — Camera Protocol v2 (camera state, recording and stream information)
[6] ArduPilot — Battery Monitors overview (power monitoring and battery failsafes)





